tyler-smith.com · Questions & Answers

We built our Vision/Traction Organizer six months ago, but our quarterly planning sessions feel disconnected from our 10-Year Target and 3-Year Picture. How do we use the V/TO during session day to drive backward-engineered annual goals and quarterly Rocks?

A Vision/Traction Organizer that sits in a binder is just expensive paper. The V/TO is designed to function as an engineering blueprint where every single quarterly action is backward-calculated from your long-range target.

When quarterly planning feels disconnected, it means the team is planning forwards from current fires rather than backwards from the vision. In your next quarterly session, enforce a strict top-down review before anyone is allowed to suggest a single Rock.

Start with the 10-Year Target to ground the room in the ultimate destination. Next, inspect the 3-Year Picture. Read the revenue, profit, and measurable bullet points aloud. Ask the team: If this is where we must stand thirty-six months from today, what must be true twelve months from today? Look directly at the 1-Year Plan on page two.

Evaluate the 1-Year Plan goals. Are those goals mathematically sufficient to achieve the 3-Year Picture? If not, adjust the 1-Year Plan immediately. Only after the 1-Year Plan is solidified do you introduce quarterly Rocks.

The Integrator asks: Given what we must accomplish this calendar year, what are the few most important priorities that must be completed over the next ninety days to keep us on pace? Every proposed Rock must justify its existence against a specific 1-Year Plan goal.

If a proposed Rock does not directly move a 1-Year Plan measurable or eliminate a structural bottleneck preventing that goal, it does not get chosen. It goes to the long-term Issues List. That is how the V/TO ceases to be a static document and becomes an active strategic filter.

Category: EOS Implementation