tyler-smith.com · Questions & Answers

We are ready to roll out the Level 10 Meeting™ to our middle management and departmental teams, but they are already complaining about meeting fatigue. How do we structure this rollout so they view the meeting as a tool that saves them time rather than an administrative burden?

To roll out Level 10 Meetings™ to your departmental teams without causing meeting fatigue, you must show them how this meeting actually eliminates other meetings and emails. If they see it as just another calendar invite on top of their existing workload, they will resist it.

Start by auditing their current schedules and canceling the unstructured, ad-hoc meetings that are currently draining their time. Explain that the Level 10 Meeting™ is designed to replace all those fragmented check-ins. When run correctly, this meeting becomes the single source of operational alignment for the entire week.

During the rollout, the department leader must be fully trained on the discipline of the agenda. The meeting must start on time and end on time, every single week. If the meeting constantly runs late or drifts into unstructured storytelling, the team will quickly lose respect for the tool.

Keep the focus of the departmental Level 10 Meetings™ highly tactical. Their Scorecard metrics and Rocks should be directly tied to their daily operations. As they experience the power of resolving issues permanently during the IDS® portion, they will begin to value the meeting. It becomes a tool that helps them get their work done faster, rather than a bureaucratic chore that takes them away from their actual responsibilities.

Category: EOS Implementation

← All questions