We have fifteen issues on our Level 10 list every week, but after we solve numbers one, two, and three, our team loses steam and the facilitator struggles to re-prioritize the remaining list. How do we maintain momentum and pacing through the full sixty minutes of IDS®?
Pacing problems during IDS happen because teams treat the Issues List as a linear queue instead of a dynamic problem-solving session. When you finish your initial top three issues, people naturally let their guard down, check out mentally, or assume the hard work of the meeting is finished.
To maintain high-velocity pacing across the full sixty minutes, use this exact facilitation rhythm:
First, re-rank immediately. The moment issue number three is solved with an assigned To-Do, the facilitator must call an immediate pause and announce: We have twenty-five minutes left. Look at the remaining board. What are the new number one, number two, and number three? Do not let the team simply drift into whatever issue happens to sit on line four of your list. Force the team to actively re-select the most critical problem on the board.
Second, watch the clock per issue. If an issue has been debated for twelve minutes and the team is repeating the same arguments, call it out. The facilitator must intervene: We are talking in circles. What is the root cause, or do we need data from an owner before we can decide? Either solve it or push it down the list.
Third, celebrate speed over volume. Solving two massive, structural issues permanently is vastly superior to plowing through seven minor operational irritations. Keep the team focused on enterprise impact rather than clearing the board.
Category: Level 10 Meetings