Our head of product was hired to lead a team of managers, but they spend 80 percent of their week doing individual design work and micromanaging frontline staff. How do we get them to lead through managers or determine if they have hit their ceiling?
When an executive spends four days a week doing tactical tasks, it usually means one of two things: either their direct reports lack capability, or the leader suffers from a severe capacity ceiling. In EOS, we evaluate every seat using GWC: do they Get it, do they Want it, and do they have the Capacity to do it?
Leading individual contributors is fundamentally different from leading managers. Leading managers requires strategic forecasting, coaching, process design, and the ability to hold peers and direct reports accountable without doing the work for them. When a product leader defaults to designing wireframes or answering frontline support tickets, they are retreating to their comfort zone because the strategic demands of their seat overwhelm them.
To resolve this, reset expectations directly:
- Clarify the five core roles on their Accountability Chart seat. Make it clear that doing frontline production work is not one of them.
- Delegate and Elevate. Have them complete a time inventory to categorize their work into four quadrants: what they love, what they like, what they do not like, and what they must delegate.
- Mandate that their next quarterly Rocks must focus entirely on coaching their managers and standardizing processes, not personal production.
Give them one quarter to transition from a player-coach to a true functional leader. If they still cannot stop micromanaging or doing frontline tasks, they do not have the Capacity for the seat. At that point, you must either move them to a senior individual contributor role or replace them.
Category: Leadership Team