tyler-smith.com · Questions & Answers

One of my department heads consistently rates our Level 10 Meeting a six or seven, but when we ask why, they just say they do not have any feedback. How do we handle a team member who drags down the rating without offering solutions?

When a team member consistently rates the Level 10 Meeting low (a six or seven) without providing specific feedback, it indicates a breach of the trust pillar within your leadership team charter. Rating the meeting is not a passive act; it's an active tool for continuous improvement.

Here's how to address this:

• Immediate Inquiry: The facilitator must immediately ask, "What would have made this meeting a ten for you?" This direct question forces them to articulate specific issues.
• Challenge Vague Responses: If the person gives vague answers like "it just felt slow" or "I do not know," you must challenge them. Remind the team that a low rating without constructive feedback is unacceptable.
• Accountability for Low Ratings: If someone rates the meeting below an eight, they are accountable for identifying the specific breakdown. This could be:
• A weak segue.
• Poor time management.
• A failure to get to the root of an issue during IDS (Identify, Discuss, Solve). For tips on managing issues, see [how do we use the Accountability Chart to stop the blame game during meetings?](/qa/using-accountability-chart-to-stop-blame-in-ids).
• Offline Discussion: If this behavior persists, the Integrator must address it in a one-on-one discussion.
• Apply the GWC Filter: During this discussion, use the GWC filter (Gets it, Wants it, Capacity to do it) to determine if this person truly understands and possesses the capacity to participate in a healthy, open, and honest leadership team. For more on GWC, consider [how do I structure a developmental runway on our chart without prematurely giving them seats they are not ready to own?](/qa/internal-promotion-runway-accountability-chart). A leader who refuses to engage in constructive feedback is actively pulling down the traction of the entire organization.

Related questions

• [Our Integrator acts as the Level 10 Meeting facilitator but struggles to participate objectively because they are busy managing the timer and the agenda. Should we rotate the facilitator role or hire an outside moderator?](/qa/should-integrator-facilitate-level-10-meetings)
• [Our weekly segue during the Level 10 Meeting consistently runs fifteen minutes late because my leadership team uses it to share long-winded personal life updates. How do I rein in the segue without killing team culture?](/qa/rein-in-level-10-meeting-segue)
• [How do I know if my team actually trusts each other, or if they are just playing nice to avoid conflict?](/qa/leadership-team-trust-healthy-conflict)
• [One of our key managers gets defensive and starts explaining away the context every time their scorecard metric drops into the red. How do we handle this in the Level 10 Meeting?](/qa/handling-defensiveness-around-red-scorecard-metrics)

Category: Level 10 Meetings

← All questions