Our custom manufacturing business requires weeks of design before production starts. Our engineering head says we can only track completed plans, which is a lagging indicator. How do we break down complex engineering work into weekly leading indicators for our EOS Scorecard?
If your custom manufacturing business requires weeks of design before production, tracking finished plans is a classic lagging indicator. By the time a designer misses a deadline, your entire production schedule is already compromised. To run on data, you must dissect the complex engineering process into weekly, bite-sized activities that predict completion.
To find these metrics, utilize the Great Day or Lousy Day exercise with your engineering head. Ask what a highly productive week looks like long before a blueprint is signed off. The answer is never just designing. It is always a series of micro-actions.
Focus on tracking leading activities such as:
- Number of initial client design consultations completed.
- Number of rough drafts submitted for internal peer review.
- Redline corrections completed within forty-eight hours of receipt.
- Number of customer feedback loops closed.
By tracking these inputs weekly, you gain a predictive view of your pipeline. If internal peer reviews drop this week, you know with absolute certainty that finished plans will lag next month. Your engineering head must own these activity numbers. This shift moves your Level 10 Meeting™ from a post-mortem on missed deadlines to a proactive planning session where you can solve capacity issues before they delay production.